Skip to content
Politically.com Search all
Menu

Wyoming 2026

SF 102

Wyoming energy transmission study.

Source: Open States / PluralUpdated 2026-11-06 13:11:08 UTC.

Official record

Measure details

Jurisdiction
Wyoming
Session
2026
Chamber
upper
Classification
bill
Subjects
Not supplied
Introduced / first action
2026-02-10 23:32:33

Alternate titles

  • AN ACT relating to the Wyoming energy authority; requiring the completion of a transmission study; specifying requirements of the study; requiring reports; and providing for an effective date.

Source-supplied abstracts

This act requires the Wyoming Energy Authority to complete a transmission planning study concerning Wyoming's transmission system and the potential growth of that system. The act requires the Energy Authority to complete the study in two (2) phases. Phase one (1) must analyze the impacts of three potential load-growth scenarios on Wyoming's current system, including a model of Wyoming's transmission needs and the consideration of advanced transmission technologies and electricity storage to meet the need for expanded transmission. Phase two (2) requires the Energy Authority to develop a qualitative summary of Wyoming public utilities' participation, if any, in regional transmission organizations. The act requires the Wyoming Energy Authority to report twice to the Joint Corporations, Elections, and Political Subdivisions Interim Committee and the Joint Minerals, Business, and Economic Development Interim Committee on the results of each phase of the study. The act requires the Energy Authority to establish an advisory working group to provide input on the required study. The working group must be comprised of, at a minimum, the Public Service Commission, the Office of Consumer Advocate, and representatives from investor-owned public utilities, municipal utilities, and rural electric cooperatives. Comments: This act is effective immediately. This act requires two (2) reports from the Wyoming Energy Authority to the Joint Corporations, Elections, and Political Subdivisions Interim Committee and the Joint Minerals, Business, and Economic Development Interim Committee. The first report (for phase one (1) of the study) is due by November 1, 2027; the second report (for phase two) is due by September 1, 2028.

AN ACT relating to the Wyoming energy authority; requiring the completion of a transmission study; specifying requirements of the study; requiring reports; and providing for an effective date.

Sponsors

Source-supplied history

Actions

  1. Assigned Chapter Number 58

    became-law
  2. Governor Signed SEA No. 0050

    executive-signature
  3. H Speaker Signed SEA No. 0050

  4. S President Signed SEA No. 0050

  5. Assigned Number SEA No. 0050

  6. H 3rd Reading:Passed 58-2-2-0-0

    passage, reading-3
  7. H 2nd Reading:Passed

    reading-2
  8. H COW:Passed

    committee-passage-favorable
  9. H Placed on General File

  10. H09 - Minerals:Recommend Do Pass 9-0-0-0-0

    committee-passage-favorable
  11. H Introduced and Referred to H09 - Minerals

    introduction, referral-committee
  12. H Received for Introduction

    filing
  13. S 3rd Reading:Passed 31-0-0-0-0

    passage, reading-3
  14. S 2nd Reading:Passed

    reading-2
  15. S COW:Passed

    committee-passage-favorable
  16. S Placed on General File

  17. S07 - Corporations:Recommend Amend and Do Pass 5-0-0-0-0

    committee-passage-favorable
  18. S Introduced and Referred to S07 - Corporations 29-2-0-0-0

    introduction, referral-committee
  19. S Received for Introduction

    filing
  20. Bill Number Assigned

    reading-1

When supplied by the API

Related measures

No resolvable related measure is supplied.