SF 99

Prescriptive easements for electricity delivery.

Source: Open States / PluralUpdated 2026-11-06 13:11:08 UTC.

Official record

Measure details

Jurisdiction
Wyoming
Session
2026
Chamber
upper
Classification
bill
Subjects
Not supplied
Introduced / first action
2026-02-10 23:21:26

Alternate titles

  • AN ACT relating to property, conveyances and security transactions; providing legislative findings; providing definitions; providing an easement for electric transmission lines and distributions systems as specified; specifying applicability; and providing for an effective date.

Source-supplied abstracts

This act authorizes a nonexclusive easement for electric utilities for a delivery system (the physical structures and power lines that convey electricity) if all of the following have been met:The electric utility has installed a delivery system.The delivery system is visibly installed so as to provide successors-in-interest constructive or actual notice that the delivery system exists on the property.The delivery system was installed on or before January 1, 2026.The delivery system's use is continuous and uninterrupted (for purposes of this requirement, an interruption must exceed one (1) year to be not continuous). The act provides that, upon the establishment of an easement for the electric utility, the electric utility has the right to reconstruct, re-phase, maintain and repair the existing system and to remove trees and vegetation likely to become hazardous to the system. Access to the easement granted under this act is limited to that access necessary to exercise the rights and privileges granted under this act, except that further access is authorized if access to the easement would be hazardous or materially encumbered. The act provides that the easement cannot exceed thirty (30) feet from any direction from the location of the physical parts of the system, and an easement is deemed abandoned if the electric utility fails to use the delivery system for more than three (3) consecutive years without an agreement with the landowner. Before the electric utility is granted an easement, the utility must publish a notice in a local newspaper or customer newsletter.

AN ACT relating to property, conveyances and security transactions; providing legislative findings; providing definitions; providing an easement for electric transmission lines and distributions systems as specified; specifying applicability; and providing for an effective date.

Sponsors

Source-supplied history

Actions

  1. Assigned Chapter Number 102

    became-law
  2. Governor Signed SEA No. 0063

    executive-signature
  3. H Speaker Signed SEA No. 0063

  4. S President Signed SEA No. 0063

  5. Assigned Number SEA No. 0063

  6. S Concur:Passed 28-3-0-0-0

  7. S Received for Concurrence

  8. H 3rd Reading:Passed 47-14-1-0-0

    passage, reading-3
  9. H 2nd Reading:Passed

    reading-2
  10. H COW:Passed

    committee-passage-favorable
  11. H Placed on General File

  12. H09 - Minerals:Recommend Amend and Do Pass 7-0-2-0-0

    committee-passage-favorable
  13. H Introduced and Referred to H09 - Minerals

    introduction, referral-committee
  14. H Received for Introduction

    filing
  15. S 3rd Reading:Passed 29-2-0-0-0

    passage, reading-3
  16. S 2nd Reading:Passed

    reading-2
  17. S COW:Passed

    committee-passage-favorable
  18. S Placed on General File

  19. S01 - Judiciary:Recommend Do Pass 5-0-0-0-0

    committee-passage-favorable
  20. S Introduced and Referred to S01 - Judiciary 23-8-0-0-0

    introduction, referral-committee
  21. S Received for Introduction

    filing
  22. Bill Number Assigned

    reading-1